top of page
September 2019
The media room interior walls have been finished and work on the front stateroom has started.
Most of the AC lines have been run from the utility room (electrical panel) and the electrical equipment (Isolation Transformer, Inverter, Auto Transformer, Genset). We have installed the 50a shore power reel and plan to start installing the electrical panel soon.
bottom of page

