Installation of the salon walls has started and we built the day head in the pilothouse.

The salon walls are now finished and work on the tray ceiling has started along with the installation of the portholes. We also built the side wall for the refrigerator and two walls for the front stateroom. We also installed the replacement hatch in the floor of the front stateroom.

Work started on installing the HVAC in the media room.