Work has been progressing on the fuel system and three out of the four tanks are connected and working. We are waiting for additional hose clamps and hanger so that we can connect the last tank.  We also received the Mantus anchor, bow roller and bridle. In order to use the new anchor we had to move the windlass from a side facing position to a  forward facing position which has been completed.  We have also started wiring the bow thruster compartment and should have the windlass and bow thruster wired by the end of the month.  Finally the props and shafts have arrived and are ready to be installed.