top of page

September 2020

Left_Arrow.png
Right_Arrow.png

Jeanne clean and refurbished the Teak Table that came with the boat to start the month. We then worked on removing all of the old hoses from the engines and installing the new exhaust hoses. We continued working on the PH dash and installed the monitors. The Engine room ventilation has been installed and we had a logo for Blue Sky designed and plan to have some Shirts made with the logo.  We install the Stb engine cooling hose and install the analog gauges in the equipment room. Overall it was a busy (and HOT) September in Florida.

Subscribe

©2018 by Blue Sky Trawler

bottom of page